City of Colton (CA)
Centrifuge Installation Project
Centrifuge Installation Project
ADS Engineering provided electrical and instrumentation design for addition of centrifuge dewatering system.
System is based on a sludge feed pump, centrifuge, inclined conveyor and polymer addition chemical system.
Project Highlights:
Client:
Schedule:
Project Highlights:
- Design of new dewatering distribution panel and addition of one section to the existing Main Distribution Panel to support the new centrifuge system.
- Dewatering system canopy electrical systems and lighting design.
- Design of power feed for chemical subsystem, control and metering equipment.
- Interfacing control equipment to the Dewatering Centrifuge Control Panel.
- Providing fiber optic interface to the existing control system.
- Instrumentation design specification for the new dewatering system package.
Jess Sotto, PE
Public Works Department
Water/Wastewater Division
City of Colton
160 S. 10th Street
Colton, CA | 92324
Client:
Carollo Engineers, Inc
Brandon Yallaly
Vice President
12592 W Explorer Dr, Ste. 200
Boise, ID 83713
Schedule:
Project design completed in 12, 2015