North Springs Improvement District
Stormwater Pump Station
By requirements of South Florida Water Management District, the telemetry for the NSID pumping station was needed. ADS Engineering designed and installed RTU for remote telemetry of upstream and downstream water level and created program for the RTU controller.

Project Highlights:
  • Design of the RTU for pump station upstream and downstream level measurement.
  • Installation of the RTU.
  • PLC Program creation.
  • Interfacing through the communication with the plant SCADA
Owner/Client:

North Springs Improvement District


Schedule:

Project completed:

Pump station No.1 03, 2009

Pump station No.2 08, 2011


Total Project Cost: $65,000.00