Seacoast Utilities Authority
2015 Lift Station 54 Improvements
ADS Engineering provided electrical and instrumentation design for upgrade of wastewater pump station with four pumps.

Project Highlights:
  • Design for replacement of the pump generator, service disconnect and pump disconnects.
  • Addition of generator battery charger.
  • Control panel connection to ATS switch, generator and generator fuel system for monitoring purposes.
Owner:

Seacoast Utilities Authority

4200 Hood Rd

Palm Beach Gardens, FL 33410


Client:

Globaltech

6001 Broken Sound PKWY NW, St 610

Boca Raton, Florida 33487


Schedule:

Project design completed in 09, 2015