Seminole Tribe Of Florida
Lift Station Rehabilitation
ADS Engineering provided electrical and instrumentation design for twelve duplex utility wastewater lift stations.

Project Highlights:
  • Design lift station power supply.
  • Design new lift station control panel for two submersible pumps. The following was provided:
    • Usage of 10-sensor level probe.
    • Customer requested controller (Multitrode).
    • Battery backup power supply.
    • Pump insulation resistance monitoring.
    • Emergency generator and ATS switch monitoring.
    • Wet-well gas monitoring.
Owner:

Seminole Tribe Of Florida

Utilities/Public Works Department

3107 North State Road 7

Holywood, Florida 33021


Client:

CH2M HILL

550 W. cypress Creak Road, St 400

Fort Lauderdale, Florida 33309


Schedule:

Project design completed in 05, 2014

Project completed in 03, 2015